Knovalent
Call 734-996-8300
  • Home
  • About
  • Software
  • EDI Partners
  • Consulting
  • Consulting Clients
  • Contact
  • Support

Material Requirements Planning

The Material Requirements Planning (MRP) ‘engine’ is critical to the success of any manufacturing system implementation. MRP is a very sophisticated calculator - it determines what raw materials are needed and when they should arrive and it develops a detail-manufacturing schedule, which includes finished products and all required sub-assemblies. The Vanguard MRP system accomplishes these tasks quickly and accurately - and provides considerable flexibility and control for the planner to establish parameters and ‘tune’ the process for optimum performance.

Key benefits of MRP

  • Automate the tedious material planning tasks
  • Accurately plan material requirements to support the production plan
  • Easily develop production schedules
  • Partial or fully automated operation
  • On-line visibility to sources of requirements

Key features of MRP

  • MRP can be driven by the master production schedule (MRP) - or directly by customer releases and orders
  • Utilizes bucketless time-phased requirements planning
  • Plans item schedules for repetitive manufactured items
  • Plans shop floor work orders for discrete manufactured items
  • Accommodates multiple lot sizing techniques with minimum, incremental and maximum lot size control
  • Includes a time fence definition to stabilize the material plan
  • Accommodates firm planned orders
  • Accommodates phantom items within the bill of material
  • On-line multi-level bi-directional pegging for full visibility of requirements and supplies
  • Available-to-promise visibility
  • Planners can work by exception - automatically flag all recommendations as released when created
  • Automates the execution of MRP recommendations: creates Shop Floor Control schedules and purchase orders, PO
  • Paperless MRP-no reports required - no re- keying of data required - MRP plan is on-line
  • Simulation runs of MRP for what-if analysis
  • Accommodates engineering change notification dates as stamped on the bill of material and/or routing
  • Filters eliminate recommendations with minor impact
  • Net-change reporting

Contact

Knovalent
3135 South State Suite 300
Ann Arbor, MI 48108
Phone 734-996-8300
© 2025 Knovalent Powered by Jottful